Please fill all required fields
Florida University Solar Energy Calculator
Please select nearest location:
Daytona Beach
Fort Lauderdale
Fort Myers
Gainesville
Jacksonville
Key West
Lakeland
Miami
Orlando
Panama City
Pensacola
St. Petersburg
Sarasota
Tallahassee
Tampa
West Palm Beach
Input Parameters
System Estimates
Cost Assumptions
Phase (Click for Details)
Area In Square Feet
Scenario
Percentage of Area Used
Peak Watts/SF
System Size (MW)
System Cost
Annual Production (kWh)
Cases
$/Watt
Base Solar Panel
$3.00
1. Open Areas
A. Rail Mounted Crystalline (Min)
A. Rail Mounted Crystalline (Mean)
A. Rail Mounted Crystalline (Max)
B. Passive Tracking Crystalline (Min)
B. Passive Tracking Crystalline (Mean)
B. Passive Tracking Crystalline (Max)
C. Single-Axis Tracking Crystalline (Min)
C. Single-Axis Tracking Crystalline (Mean)
C. Single-Axis Tracking Crystalline (Max)
D. Dual-Axis Tracking Crystalline (Min)
D. Dual-Axis Tracking (Mean)
D. Dual-Axis Tracking Crystalline (Max)
E. Enclosed/Mounted Thin Film (Min)
E. Enclosed/Mounted Thin Film (Mean)
E. Enclosed/Mounted Thin Film (Max)
F. Concentrating PV (Min)
F. Concentrating PV (Mean)
F. Concentrating PV (Max)
Thin Film (-$1)
$2.00
2. Building Roofs
A. Solyndra (Min)
A. Solyndra (Mean)
A. Solyndra (Max)
B. Flat Thin Film (Min)
B. Flat Thin Film (Mean)
B. Flat Thin Film (Max)
C. SunPower Roof Tiles (Min)
C. SunPower Roof Tiles(Mean)
C. SunPower Roof Tiles (Max)
CPV (+$1)
$4.00
3. Parking Lots
A. Crystalline Engineered Structure (Min)
A. Crystalline Engineered Structure (Mean)
A. Crystalline Engineered Structure (Max)
B. Thin Film Engineered Structure (Min)
B. Thin Film Engineered Structure (Mean)
B. Thin Film Engineered Structure (Max)
C. Envision Solar Grove (Min)
C. Envision Solar Grove (Mean)
C. Envision Solar Grove (Max)
Ground Support System
$1.00
4. Parking Garages
A. Crystalline Engineered Structure (Min)
A. Crystalline Engineered Structure (Mean)
A. Crystalline Engineered Structure (Max)
B. Thin Film Engineered Structure (Min)
B. Thin Film Engineered Structure (Mean)
B. Thin Film Engineered Structure (Max)
C. Envision Solar Grove (Min)
C. Envision Solar Grove (Mean)
C. Envision Solar Grove (Max)
Single Axis Tracking
$0.50
5. Water Coverage
A. Floating Crystalline (Min)
A. Floating Crystalline (Mean)
A. Floating Crystalline (Max)
B. Mounted Crystalline (Min)
B. Mounted Crystalline (Mean)
B. Mounted Crystalline (Max)
Dual Axis Tracking
$1.00
Electrical Integration
$1.00
Estimated Totals
Parking Lot/Garage Structure
$2.00
Estimated Average $/Watt
Water Coverage Support System
$2.50
Angled panels are oriented
degrees from horizontal
Base panel conversion efficiency:
(kWh/yr/kW)
The browser does not support JavaScript. Please access the web page using another browser.